모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -

Author
김주호; 박문서; 이현수; 현호상
Journal Title
한국건설관리학회 논문집
Publication Year
2018
Summary

This study aims to evaluate alternatives to tower crane operation methods based on cycle period settings in modular construction sites, by parameterizing unit lifting time, exterior material lifting time, and finishing work duration to determine the effect on tower crane uptime and process. A simulation model is developed to increase tower crane efficiency by controlling work speed, and a resource leveling method applying the concept of lifting cycle is proposed.

Quotation Papers(0)

List of papers cited by this paper

Thesis Indicator

Related Content

LikeSNU analyzes your query semantically to recommend related resources.

Previous
Next

Tower Crane Location Optimization for Heavy Unit Lifting in High-Rise Modular Construction

Hyun, Hosang; Park, Moonseo; Lee, Dowan; Lee, Jeonghoon · 2021

Buildings

모듈러 건축의 타워크레인 배치계획 수립을 위한 다중 최적화 모델 개발

윤성부; 박문서; 정민혁; 현호상; 안수호 · 2021

한국건설관리학회 논문집

A novel mathematical optimisation model for the scheduling of activities in modular construction factories

Hammad A.W.,Grzybowska H.,Sutrisna M.,Akbarnezhad A.,Haddad A. · 2020

Construction Management and Economics